Category Archives: Uncategorized

A Bigger splash – weeks ten and eleven – story of a swimming pond for a garden designer

 

As I write the words ‘weeks ten and eleven’ I can’t quite believe that it has been that long, despite the fact that I knew this process would take at least 2-3months. Despite this, the progress in the last couple of weeks has been phenomenal. Our beautiful Pennant paving went down this week, with a set of steps, the dramatic curved path and a counter-sweeping curve of stepping stones through the lawn. The path is a thing of beauty.

However, the more Vicky and I looked at it, the more we thought that the line of it through the

The Pennant stone path - a thing of beauty

lawn was not quite right. The idea for the stepping stone part of the path came from Glyn, our hardscape foreman (as opposed to Glen, our hard landscape manager, which is confusing for everyone). There’s a frustrated designer inside everyone. It was a great idea, and one which we latched on to straightaway; so much so that we didn’t draw anything out first (is that an alarm bell I hear ringing?). So in this morning’s drizzle, I said to Glyn that we were going to have to relay the 14, 110kg stones in a slightly different line. “You are winding me up, aren’t you?” was his not unexpected reaction. We just knew that if we didn’t re-lay them, we would be looking out of the window for the next twenty-five years regretting it. He should have expected it really, working for a couple of designers!

The irony of this was not lost on me. I have spent the last two or three days (in between other stuff) writing my presentation to the SGD conference in London on Saturday. In it I underlined the importance of good communication, a clear set of drawings and specifications, communicating with the site staff etc. etc. Alright, I know, calm down at the back there. So I write this blog to say that listening to the client is also important! When they change their mind, accept with good grace (do you think I got away with that?)

 

The shallow end of reclaimed teak at the far end of the swimming pond

We decided fairly early on to have a ‘shallow end’ in the pool. Rather than rake the bottom of the pool, we have achieved this by building a timber deck which will sit below water, giving us a depth of about 1.2m for the first 4.5m or so of one end. The frame timber is made up of English larch (from my new friends at Eco Choice) which does not leak any nasties into the water. The deck itself is made from reclaimed teak. Timber of course floats, so it may seem a bit counter-intuitive building an underwater deck. Once the wood becomes saturated (which takes quite a while) it is not nearly so buoyant, with the teak becoming heavy enough to sink. However, until then, it must be weighted down with concrete blocks, although our calculations as to how many are so unsure that we just decided in the end on ‘a lot’. We will fill the pool up slowly and see whether the deck floats. It’s called the scientific method – reaching a provable result through a controlled experiment (otherwise known as trial and error).

In the almost final fortnight (apart from re-laying slabs), the lawn will go down, the sun deck will go into place and the pool will get filled and planted!

A Bigger Splash – week four – story of a swimming pond for a garden designer

The builders yard - a necessary evil?

Although the design for the rear garden is finally starting to emerge from the muck and bullets, the front drive looks like a builder’s yard. In addition to the bulk bags of sand and ballast, pallets of cement, glass filtration aggregate, plumbing fittings, geotextile, reclaimed teak decking, and mulch visible in this photo, there is a 7m long roll of liner and 75no new English oak sleepers out of shot.

One of the principal features of the design is a curved path running around one end of the pool connecting the lawn to the forest garden. This is made up of single 1.2m wedge-shaped slabs of stone. Of course, with two garden designers, selecting the material was always going to be a difficult process. We had recently come across a very interesting stone from the Forest of Dean, called Pennant.

The curved walls that will run benath the new Pennant Stone path

I had been vaguely aware of this stone for about ten years, but never really used it. We had selected it for a large project in Berkshire, and liked the subtlety of the blue grey and buff tones. As well as the quality of the stone, what really impressed us though were the go-ahead attitude of the quarry and the sustainability of the production process. All the quarried material is used and the production unit (which is under the same ownership) can process up to 1000m2 a week – not relevant to our garden, but very useful on our site in Berkshire! The stone saws are powered by the plant’s own hydro-electric power unit producing 13.5kW of power. The stone was supplied through Edward Tennant at Ashfield Stone, who was extremely helpful (www.ashfieldgroup.com).

The path swings on a single radius of 11.1m, so precision is absolutely key. Glen has been keeping a very close eye on the measurements, as there is no room for error. The individual stones (of which there are forty) weigh 106kg each, so laying them will not be easy. After looking carefully at all the possibilities, we decided on suspending the slabs from the end of the excavator arm using a stone lifter. This should allow us to rotate and position the individual slabs very accurately. They will be delivered in about two weeks, so we will see. The block-work support for this path is going in at the moment.

Selecting the timber has been equally tortuous, for various reasons. There are a number of locations which have different requirements hence a variety of timbers are being used. The retaining walls for the lower areas are vertical (new) oak sleepers laid in sweeping curves. Within the pool, the main walls are topped of with capping of western red cedar (which will be under water.) In addition to this, there is a deck about a metre below water level at either end. This is to be made of reclaimed teak decking on a network of larch beams. It is not possible to use any treated timber in the water, because the chemicals used in the preservative process are effective biocides. There is also a deck suspended above the northern end of the pool. This must also be of larch bearers. We wanted to use locally sourced FSC timber wherever we could. The sleepers were fairly easy as there are many companies supplying English oak sleepers, but the other timbers were more difficult. EcoChoice (based in Cambridge – www.ecochoice.co.uk) were particularly helpful. We managed through them to find some really good British grown larch and western red cedar. I had only come across Canadian or Russian WRC before, so this was a revelation to me. the timber is a little knottier than Canadian, but a lot cheaper and perfectly good enough for our purposes.

Blockwork starting to go in for the deepwater renegeration beds (before rain stopped play)

 

A spring scene: what is left of our lawn, with the pretend farmyard in the distance (aka the messy area next to my veg garden) and the edge of the new herbaceous bed in the foreground.

Although the end is in site, I don’t think we will be finshed for when my family descend at Easter. What’s more, inevitably other work is starting to clamour for the team. Suddenly I am feeling like one of those clients who says – “It must be finished for my party on Saturday Week”. I’ll start changing the design soon…

I am beginning to develop designs for the main herbaceous bed. Not that we can agree on what plants to use. And as always, visualising herbaceous plants in their summer glory in what still feels like the depths of winter is a cross between torture and therapy. More on this next week.